MCS, RECC and HIES: solar accreditations explained

The short answer: MCS certifies that an installer and the products they fit meet set standards. RECC and HIES are consumer codes that protect your money. Without an MCS-certified installation you cannot normally claim export payments or use government-backed funding.

What each one is

Name What it is What it gives you
MCS A certification scheme for small-scale renewable installers and products An MCS certificate for your system, which export tariffs and funding schemes ask for
RECC The Renewable Energy Consumer Code Rules on selling, deposits, contracts and guarantees, plus dispute resolution
HIES The Home Insulation and Energy Systems consumer code Similar protections to RECC, including deposit and guarantee protection
TrustMark A government-endorsed quality scheme for work in and around the home Extra reassurance; required for some funded schemes

MCS-certified installers must belong to an approved consumer code.

Why MCS matters

  • Export payments. The Smart Export Guarantee requires your installation and installer to be certified through MCS or an equivalent scheme.
  • Warm Homes loan. The work must be done by an MCS-certified installer.
  • Boiler Upgrade Scheme. Heat pump installers must be MCS certified.
  • Selling your home. Buyers' solicitors ask for the MCS certificate.

What the consumer codes protect

  • Your deposit. RECC limits its members to a deposit of no more than 25% of the contract price, and deposits must be protected.
  • Your guarantee. An insurance-backed guarantee covers the workmanship if the installer stops trading.
  • How you are sold to. The codes ban pressure selling and misleading claims.
  • Disputes. You get access to independent dispute resolution.

How to check an installer

  1. Search for the company on the MCS website. Do not rely on a logo.
  2. Check the certificate covers solar PV, not only another technology.
  3. Check their membership on the RECC or HIES website.
  4. Ask for their MCS number and confirm it matches the company on your contract.

What you should receive afterwards

  • Your MCS certificate
  • Confirmation that the network operator has been notified
  • A building regulations compliance certificate
  • Your insurance-backed guarantee documents
  • Product warranties

Equivalent schemes

MCS is the main scheme, but not the only one. Export tariffs also accept schemes accredited as equivalent, such as Flexi-Orb. Check which scheme your chosen funding or tariff accepts.

See how to choose a solar panel installer and how to avoid rogue installers.